top of page

Construction of 6" Flow line total length 47km

 

 

Brief Scope Of Work: Construction of 6" flow lines with a total length of 47 kilometers. This project includes transportation, stringing, bending, welding, Post Weld Heat Treatment (PWHT), Non-Destructive Testing, trenching, lowering, backfilling and Pre-commissioning. It Also includes the connection to end facilities at wellhead and OGM (Oil Gathering Manifold).

Client: China Petroleum Engineering & Construction.

 

 

Location: AHDEB Oïl Field /Wassit.

 

 

Duration: 23rd Of March 2013 to 10th Of October 2015.

Album Gallery