Construction of 6" Flow line total length 47km
Brief Scope Of Work: Construction of 6" flow lines with a total length of 47 kilometers. This project includes transportation, stringing, bending, welding, Post Weld Heat Treatment (PWHT), Non-Destructive Testing, trenching, lowering, backfilling and Pre-commissioning. It Also includes the connection to end facilities at wellhead and OGM (Oil Gathering Manifold).
Client: China Petroleum Engineering & Construction.
Location: AHDEB Oïl Field /Wassit.
Duration: 23rd Of March 2013 to 10th Of October 2015.